Design, Supply, Installation, Testing and Commissioning including Operations and Maintenance of gas tank farm with four (4) Nos. of 91,000 liters tank and distribution network to supply gas to more than 20 commercial and residential buildings for the EXPO2020
Supply, installation, including two tie-in connections to pipelines , testing, and commissioning of approx. 7 km of HDPE SDR11 gas networks to serve EXPO 2020 retails and commercial customers.
An integral part of the development of the EMAAR SOUTH Properties located at South Dubai. The area consists of mid-rise buildings, luxury villas, residential town houses, community facilities, public parks, mosques, club houses and other related services which will be gas supplied from a central LPG gas system covering various domestic and commercial consumers. Consequently, Gas Tank Farms and a Gas Distribution Network has been constructed in EMAAR SOUTH to supply gas to domestic and commercial consumers.
Design, Supply, Installation, Testing, Commissioning and Operation of the Gas Farms for Phase 1 & 2 with 22,000 liters tanks (Future expansion of 2 Nos 22,000 liters tanks) and associated vaporization system, pressure reducing and metering station, electrical and gas monitoring system and necessary cathodic protection including Gas Distribution Networks with an approximate length of 38.6 Km for Emaar South Development serving more than 2000 units. The principle of redundancy in the event of malfunction, or during the maintenance of the site will be maintained, thus guaranteeing continuity of supply at all times. The capacity and the overall performance of the system after the expansion will be such as to cover the future requirements.
Relocation of standalone Gas Tank Farms then Upgrade, Design, Execution and Completion of a New Gas Farm with eight (8) Nos. of 100,000-liters tank and associated vaporization system, pressure reducing and metering stations, electrical and monitoring system including the Gas Distribution Network to cater the whole of Emaar Downtown Dubai Development with an approximate GAS network length of 17 Km
Carried out Detailed Engineering, Design, Construction, Installation, Testing and commissioning of all Civil, Structural, Mechanical and Electrical Plant & Equipment, Instrumentation, gas monitoring as required including Gas Storage Area, Gas Tanks, Filling Points, Primary Distribution network, Tie-in to the existing primary or secondary distribution network- Considering the Existing infrastructure and connectivity to the buildings then operating and maintaining all commercial and residential clients not limited to (Dubai mall, Burj Khalifa, address Hotels, Souq al behar ….etc)
Design, Supply, Installation, Testing, Commissioning and Trial Operation of Gas Plant with 3 Nos of 91,000-liters tanks and associated vaporization system, pressure reducing and metering station, electrical and gas monitoring system including Gas Distribution Networks.
The pipeline network is constructed of HDPE piping and includes all valves, regulators, and metering necessary for operating a safe system. Also included in scope are safe and reliable operations and maintenance services. This project consist of an estimated 20,000 meters of gas mains, which serve over residential units, Retails and commercial outlets.
Also Lootah BCGAS provides Operation and Maintenance services for Dubai Creek Harbor Development. These services include 24-hour call center & emergency response, connecting, disconnecting & billing customers, collection of gas revenue from customers, provision of reliable & safe gas supply, regular patrols and surveys, and performance of all necessary repairs.
Design, Supply, Construction, Installation, Testing and Commissioning of two (2) tank farms with a total aggregate capacity of 327,200 liters (8 Nos. of 40,900 liters tank each) at Dubai Hills Estate with more than 150km of distribution networks serving more than 5,000 residential customers and 75 commercial units (mall, hospital and restaurants)
Design, Supply, Construction, Installation, Testing and Commissioning of two (2) tank farms with a total aggregate capacity of 327,200 liters (8 Nos. of 40,900 liters tank each) at Dubai Hills Estate with more than 150km of distribution networks serving more than 5,000 residential customers and 75 commercial units (mall, hospital and restaurants)
An integral part of the development of the Jumeirah Lake Towers located at Dubai are the construction of mid-rise buildings, community facilities, public parks, club houses, schools and other related services which will be gas supplied from a centralized LPG gas system intended for the various domestic and commercial consumers. Consequently, Gas Tank Farm and Distribution Network have been constructed in JLT – Jumeirah Lake Towers to supply gas to commercial consumers
Design, Build, Operate and Maintain the gas network infrastructure at Jumeirah Lake Towers which includes fifteen (15) gas tank farms with a total aggregate capacity of 182,000 (26 nos. of 7000 liters tank) and connecting 194 retail customers through 18 km of gas distribution networks in a fully developed area with provisions to connect new commercial and residential buildings The capacity and the overall performance of the system after the expansion will be such as to cover the future requirements
The AL GHADEER Phase 2 development of ALGHADEER Residential 707 villas Project at Al Ghadeer, Abu Dhabi, UAE. Design a Gas distribution Network consists of Natural Gas from the Network is rerouted into various types of villas such as Town Houses and condominium type villas.
Design, Supply, Installation, Testing, Pre-Commissioning & Handing Over of Natural Gas System Works for 707 Units (243 Villas & 464 Apartments) in Al Ghadeer Phase 2, Abu Dhabi which is operated by ANDOC city gas.
Supply, Installation, Testing and commissioning of twin stream Pressure Reducing and Metering Skid with High Pressure Steel Natural Gas Pipeline Branch and Low-Pressure Connection to Gulf Extrusion Industry, Dubai. Inlet Pressure of 29barg with capacity of 1800m3 /hr , with full remote monitoring and control system through remote control unit powered by multiples solar panels charging system equipped with all safety devices .
Abu Dhabi Emirate FEED (Front End Engineering Design) Study on Gas Distribution year 2013 to 2015. Market Survey, Design and Feasibility study on natural gas system in Abu Dhabi Emirate and City Gas.
The project consists of designing, installing, owning and operating LPG gas pipeline distribution networks that are initially fed by central LPG tank farms. This will include installation of Synthetic Natural Gas (SNG) facilities to facilitate more efficient conversion to natural gas upon availability. Scope of work includes all installation from the inlet of the tank farm to the customer appliance (commercial & residential). The pipeline network is constructed of PE piping and includes all valves, regulators, and metering necessary for operating a safe system. Also included in scope are safe and reliable operations and maintenance services for a Concession period of 30 years. This project will consist of an estimated 55,000 meters of gas mains and gas service for over 2,500 residential & 9,000 flats, more than 47 Hotels and many other commercial customers.
Lootah BCGas designed, procured, constructed, and tested the LPG pipeline infrastructure & tank-farm installation, and provides Operation and Maintenance services for a period of 30 years. These services include 24-hour call center & emergency response, connecting, disconnecting & billing customers, collection of gas revenue from customers, provision of reliable & safe gas supply, regular patrols and surveys, and performance of all necessary repairs.
Mogul 3
Jebel Ali Village
Al Furjan
The project consists of designing, installing, owning and operating LPG gas pipeline distribution networks that are initially fed by central LPG tank farms. This will include installation of Synthetic Natural Gas (SNG) facilities to facilitate more efficient conversion to natural gas upon availability. Scope of work includes all installation from the inlet of the tank farm to the customer appliance (commercial & residential). The pipeline network is constructed of PE piping and includes all valves, regulators, and metering necessary for operating a safe system. Also included in scope are safe and reliable operations and maintenance services for a Concession period of 30 years. This project will consist of an estimated 120,000 meters of gas mains, six 50 ton below ground LPG Tanks and SNG System convertible to Natural Gas, including two SNG Tank Farms, which serve over 75,000 customers.
Lootah BCGas designed, procured, constructed, and tested the LPG pipeline infrastructure & tank-farm installation, and provides Operation and Maintenance services for a period of 30 years. These services include 24-hour call center & emergency response, connecting, disconnecting & billing customers, collection of gas revenue from customers, provision of reliable & safe gas supply, regular patrols and surveys, and performance of all necessary repairs.
The project consists of designing, installing, owning and operating LPG gas pipeline distribution networks that are initially fed by central LPG tank farms. This will include installation of LPG Tank facilities. Scope of work includes all installation from the inlet of the tank farm to the customer appliance (commercial & residential). The pipeline network is constructed of PE piping and includes all valves, regulators, and metering necessary for operating a safe system. Also included in scope are safe and reliable operations and maintenance services for a Concession period of 30 years. This project will consist of an estimated 4,000 meters of gas mains and two above – ground 4 ton LPG Tanks which serve over 208 residential villas customers.
Lootah BCGas designed, procured, constructed, and tested the LPG pipeline infrastructure & tank-farm installation, and provides Operation and Maintenance services for a period of 30 years. These services include 24-hour call center & emergency response, connecting, disconnecting & billing customers, collection of gas revenue from customers, provision of reliable & safe gas supply, regular patrols and surveys, and performance of all necessary repairs.
The project consists of designing, installing, owning and operating LPG gas pipeline distribution networks that are initially fed by central LPG tank farms. This will include installation of LPG Tank facilities. Scope of work includes all installation from the inlet of the tank farm to the customer appliance (commercial & residential). The pipeline network is constructed of PE piping and includes all valves, regulators, and metering necessary for operating a safe system. Also included in scope are safe and reliable operations and maintenance services for a Concession period of 30 years. This project will consist of an estimated 20,000 meters of gas mains and one below – ground 15 ton LPG Tank which serve over 736 residential villas customers.
Lootah BCGas designed, procured, constructed, and tested the LPG pipeline infrastructure & tank-farm installation, and provides Operation and Maintenance services for a period of 30 years. These services include 24-hour call center & emergency response, connecting, disconnecting & billing customers, collection of gas revenue from customers, provision of reliable & safe gas supply, regular patrols and surveys, and performance of all necessary repairs.
Design and Construction of LPG Gas Tank Farm with 200,000-liters tanks and associated vaporization system, pressure reducing and metering station, electrical and gas monitoring system.
The pipeline network is constructed of HDPE piping and includes all valves, regulators, and metering necessary for operating a safe system. Also included in scope are safe and reliable operations and maintenance services. This project consist of an estimated 56,000 meters of gas mains, which serve over 99,000 residential units, 6,700 hotel rooms, 780 Retail and commercial outlets.
Lootah BCGas designed, procured, constructed, and tested the LPG pipeline infrastructure & tank-farm installation, and provides Operation and Maintenance services. These services include 24-hour call center & emergency response, connecting, disconnecting & billing customers, collection of gas revenue from customers, provision of reliable & safe gas supply, regular patrols and surveys, and performance of all necessary repairs.
The project consists of designing, installing and operating LPG gas pipeline distribution networks that are initially fed by central LPG tank farms. Scope of work includes all installation from the inlet of the tank farm to the customer appliance (commercial & residential). The pipeline network is constructed of HDPE piping and includes all valves, regulators, and metering necessary for operating a safe system. Also included in scope are safe and reliable operations and maintenance services. This project consists of an estimated 56,000 meters of gas mains, 200,000 liters below ground LPG Tanks, which will serve over 95,000 residential units and various commercial customers.
LP Gas Farm and Site Wide Gas Infrastructure
EPC and Operations & Maintenance
Scope of EPC works includes the design, construction, testing and commissioning of all structural mechanical and electrical plant and equipment necessary for the provision of the required gas storage, supply, and reticulation system to the developments within several zones of Dubai Festival City. The gas is to be connected to the required building developments through a pipe reticulation network. Lootah BCGas was also responsible for the detailed design and construction of the LPG gas/Tank Farm, including architectural, civil and structural works.
Separately, Lootah BCGas is contractually responsible for Operations and Maintenance of the system.The System serves Residential houses, apartments, shopping centers, restaurants, hotels and resorts along Dubai Creek.
Lootah BCGas designed, procured, constructed, and tested the LPG pipeline infrastructure and tank-farm installation, and provides Operation and Maintenance services. These services include 24-hour call center & emergency response, connecting & disconnecting customers, provision of reliable & safe gas supply, regular patrols and surveys, and performance of all necessary repairs.
LP Gas Operating Projects - EMAAR
All of Emaar communities in Dubai with Central Gas Distribution Systems, including Burj Khalifa community and Dubai Mall with several thousand residential customers, thousands of hotel rooms, hundreds of shops and over hundreds of restaurants. Other Operating projects are The Greens, Emaar Business Square, Arabian Ranches, Dubai Marina Walk & The Town Center.
Burj Khalifa is a magnificent development of high rise commercial buildings, high rise residential buildings and low rise residential complexes . The Burj Tower, Dubai Mall and many hotels and resort facilities are also in the development. The area is served with gas from a number of strategically located tank sites and gas distribution systems provide gas throughout the area.
Through a gas-system lease arrangement, Lootah BCGas is the comprehensive operator of these systems, including all aspects such as customer billing, emergency response, maintenance and all that is involved in the safe and reliable supply of gas. This commenced with the Old Town Commercial Island area in October 2007 and is to be followed by the Burj Residence area in March 2008 and expands as each new area of the project is completed .This also includes operations and maintenance of the LPG gas distribution system in the Burj Khalifa, the World’s tallest building.
Supply, Installation and Commissioning of 24” and 16” High Pressure Steel Pipeline, 1 Primary Reducing Station and 2 Secondary Reducing Station Yas Island Pipeline & Pressure Regulation (Currently in operation with one HP PRS)
Emergency Response and Operations and Maintenance of Yas Island Development. Services include 24-hour call center & One-Hour emergency response, connecting & disconnecting customers, provision of reliable & safe gas supply, regular patrols and surveys, and performance of all necessary repairs. With complete and dedicated emergency, operations and maintenance procedures manual for Stage 1 Services specific for Yas Island Natural Gas Distribution Network and associated Pressure Reducing Station facilities and auxiliaries.
Engineering and complete installation of gas distribution network for the Al Raha Beach Development – Eastern Precincts. The project comprised of approximately 15 kilometers of PE pipes, 1.5 kilometers of steel pipes with two bridge crossings and customer service connection for residential and commercial customers
Design and construction of the natural gas network
Engineering and complete installation of gas distribution network for the Saadiyat Island – Saadiyat Link Project. The project comprised of approximately 9.5 kilometers of PE pipes, 350 customer service connection for residential and commercial customers.
Design, engineering, supply and installation of the first ever Synthetic Natural Gas (SNG) plant in Abu Dhabi. A one year Operations and maintenance contract is also in placed and will include emergency response, daily checking of SNG equipments and 24/7 security.
Engineering, procurement and construction of seven (7) natural gas vehicles filling station high pressure pipeline connections. Each station include high volume pressure reducing stations, H2s Scrubbers and Analysers, flow computers with complete instrumentation and electrical installations.
Engineering and design for a natural gas distribution network in the Emirate of Abu Dhabi including full comprehensive market studies, preparation of a design basis memorandum, outlining minimum functional specifications, material standards & specifications, construction standards & specifications, network analysis & design, construction drawings and approvals processes, comprehensive financial modeling/analysis and operations and maintenance parameters.
Front End Engineering Design study including analysis of upstream supply capacity, redundancy, pipeline routing, design specifications, material standards & specifications, construction standards & specifications and NGV station design
Complete feasibility study for natural gas distribution in Abu Dhabi including market studies, supply and demand analysis, network design, material & construction specifications, operations planning and procedures and financial & business modeling & analysis.
Complete installation of the CNG refueling station at Al Maha ADNOC station. Project included connection to high pressure pipeline of Gasco, desulfurization, pressure reducing station as well as operations & maintenance.
Engineering, Procurement and Construction for the first three phases of the Sharjah Natural Gas Distribution Project consisting of three Pressure Reducing Stations, 700 km of gas distribution mains, 150 km of service lines, piping for over 1,500 buildings, LPG to Natural Gas conversions for over 60,000 customers and service connections for over 70,000 customers. In addition, Internal natural gas & LPG piping systems for over 800 buildings were constructed.
Lootah BCGas Internal Gas Piping Division provides high quality Natural Gas and LPG Internal Piping Systems for new and existing Residential and Commercial buildings in Sharjah, Dubai and Abu Dhabi.
The Internal Gas Piping Division has successfully secured the majority share of the gas installation projects in Sharjah market since established on 2001, and is also a main installer for LPG installations in Dubai. The Internal Gas Piping Division has been always committed to a timely and high quality completion of works to the full satisfaction of our respective Clients.
Phase 1 and 2, Dar es Salaam, Tanzania
Engineering, Procurement and Construction
Engineering, Procurement and Construction of natural gas distribution network for phase 1 and phase 2 covering 2 main gate stations, 4 high pressure commercial customers, and 35 industrial customers and approximately 45 kilometers of PE pipes in varying sizes.
Lootah BCGas designed, procured, constructed, and tested the whole natural gas distribution network, all PRS’s and Customer meter sets and service connection. Continuing hydraulic analysis were performed to ensure that system capacity is maximized for new connections
Low Pressure Ring Main, High Pressure Steel Pipe Network, Pressure Reducing Stations and associated industrial meter sets Lootah BCGas operates a natural gas distribution system in Dar es Salaam serving a wide variety of industrial customers and provision for futureadditions. The primary system takes off at Songas 89 mbar transmission line with a steel line to two Main Supply Stations (PRS) from which a 7 bar Polyethylene (PE) gas distribution network is installed. The total PE gas distribution network is approximately 45 kms serving 4 high pressure customers and35 industrial customers. The whole gas distribution network, all PRSs and customer service connections were designedand constructed by Lootah BCGas under a separate EPC Contract.
Lootah BCGas designed, procured, constructed, and tested the whole gas distribution network and customer service connections. Provided operation and maintenance services which include 24-hour call center & emergency response, connecting & disconnecting customers, provision of reliable & safe gas supply, regular patrols and leak surveys, and performance of all necessary repairs.